Reliable Auto Tech Pvt. Ltd.

FACTORY BUILDING, AMBAD MIDC, NASHIK

CLIENTS
Reliable Auto Tech Pvt. Ltd., MIDC, Ambad, Nashik.
ARCHITECTS
M/ S M R Fedge & Associates (Ar Shri Rohit Fegde) Nashik
PROJECT COST
Phase I - Rs. 938 Lacs.
Phase II - Rs. 350 Lacs.
Total Area
Phase I - 53,000 sq.ft.
Phase II - 8,000 sq.ft.
Duration
Phase I - Aug. 2007 to July 2008
Phase II - 2013-2014
Features
    Phase I -
  • Area - 53,000 sq.ft.
  • R.C.C. Foundation.
  • Exclusively high Structure steel portal design with color coated Galvalume roofing.
  • Trimix RCC flooring.
  • RCC press pit foundation 6.5m deep - 75m long & 9m wide.
    Phase II -
  • Workshop Building
  • Area 8,000 sq.ft.
  • Heavy RCC foundation.
  • Structure frame with 14m height.
  • Roof colored coated galuvalumine roof sheet.
  • Tremix RCC flooring.